(1) determine the location of communicating indoor control box, which manipulated retractable door switch the device location;

(2) position the 220V power supply to the control box bottom, demand the best is take 1 grounding cable, weight specifications to 1.37, and earth-leakage protection devices, and the use of PVC concealed;

(3) reserved DIA 32mm PVC piping from the location down to below ground level at the lower end of the control box, out of the wall, to orbit approximately where 0.1-0.15 metres below ground level, for future gate house outdoor line;

(4) according to Shang table obtained openings length, masonry openings Shi hole wide within clearance not is less than 0.75-0.8 meters, height within net size General door not is less than door high + 0.25 meters, luxury door not is less than door high + 0.1 meters; openings end in side in the top left wide 0.4 meters, high 0.6 meters maintenance hole, has conditions of can will openings total length again added long 0.2-0.3 meters, such can will maintenance hole modified into a fan door, convenient future maintenance maintenance telescopic door electrical line;

(5) prior to laying track apart from the left about 0.8-0.9 meters wide, and do on both sides of the ground; 2-3 (winter 5-7 day) and then in laying track at the same time, civil serve track ground, pay attention during laying track, the road is closed to traffic, so as not to bend the track;

(6) install retractable door, connected line debug switch control box.